Discipline — Process

Process reviews where every
safety case is traceable.

Owner’s-engineer AI reviews for oil & gas deliverables — traceable findings, comment registers and human-supervised escalation in hours. Process discipline is where relief sizing errors, HAZOP gaps, and SIL miscalculations live. We find them before the client does.

Example finding

The gap that gets past HAZOP review.

Relief valve sizing cases that are not annotated against their governing scenario are the most common major finding in process reviews. The sizing calculation exists — it just is not tied back to the HAZOP action that demanded it.

MajorFinding #002·Discipline: Process

Relief valve sizing case not annotated against blocked-outlet scenario

Document: Relief Valve Sizing Calc CV-RV-2401 Rev 1
Code clause: API 520 Part I §4.2.2
Tagged device: PSV-2401 on separator V-2400
HAZOP action: Action #HAZOP-112 (blocked outlet)
Finding: HAZOP register Action #HAZOP-112 requires that PSV-2401 sizing be confirmed for blocked-outlet scenario as the governing case. Sizing calculation CV-RV-2401 presents fire-case relief as the design basis. Blocked outlet flow rate (pump run-out into closed downstream block valve) has not been evaluated as a separate case per API 520 Part I §4.2.2. If blocked outlet governs, PSV-2401 is undersized.
Recommended action: Calculate blocked-outlet relief rate at maximum pump shut-off head and compare to PSV-2401 rated capacity. If blocked outlet exceeds fire case, revise orifice selection and update HAZOP register to close Action #HAZOP-112.
Reviewed by: K. Uzowulu CEng MIMechE · Status: Escalated — HAZOP action open
Check sequence

What runs, in what order.

The check sequence is discipline-specific. Process checks run across relief sizing calculations, HAZOP registers, cause-and-effect matrices, and SIL assignment worksheets — in that order.

01

Relief device inventory vs. P&ID

API 520 Part I §2

Confirm every PSV and PRV shown on P&IDs appears in the relief device register with a sizing calculation reference. Flag orphaned devices and uncalculated entries.

02

Governing relief case identification

API 520 Part I §4.2

For each relief device, confirm all applicable scenarios have been evaluated: fire case, blocked outlet, thermal expansion, control valve failure, utility failure, reflux failure. Check that the governing case is explicitly stated.

03

Relief flow rate calculation

API 520 Part I §5

Verify that relief flow rate is derived from the governing scenario using correct thermodynamic assumptions (latent heat, vapour fraction, molecular weight). Flag where only fire-case sizing is presented.

04

Orifice size and set pressure

API 526 Table 1

Cross-check the selected orifice designation against the calculated required relieving area. Confirm set pressure ≤ MAWP and accumulation within 110% per API 520.

05

Back pressure correction

API 520 Part I §6

For conventional and balanced-bellows PSVs, check whether back pressure correction factor Kb has been applied where back pressure exceeds 10% of set pressure.

06

HAZOP action closeout status

IEC 61882 §7

For every open HAZOP action, confirm an assigned owner, due date, and current status are in the register. Flag actions with no status update older than 90 days from IFR.

07

Cause-and-effect matrix completeness

IEC 61511-1 §9.3

Cross-check C&E matrix initiating causes against HAZOP register deviations. Flag causes present in HAZOP with no C&E entry, and C&E entries with no HAZOP backing.

08

SIL target vs. calculation presence

IEC 61511-1 §11.9

Identify SIL-rated functions in the SIL assignment register. For each, confirm a SIL verification calculation (LOPA or fault tree) is in the document register and references the correct PFD target.

Real findings

What SpecSense flags in process reviews.

MajorAPI 520 Part I §4.2.2

Blocked-outlet relief case not evaluated — PSV-2401 potentially undersized

HAZOP Action #112 requires blocked-outlet case for PSV-2401. Only fire case is calculated in CV-RV-2401. Pump run-out rate at shut-off head not compared to PSV orifice capacity.

MajorIEC 61511-1 §11.9

SIL 2 function — no LOPA or fault tree in IFR document register

SIL assignment record SIL-003 lists High-Integrity Pressure Protection (HIPP) on V-1101 as SIL 2. No LOPA worksheet or fault tree present in IFR package. PFD target unverified.

MinorAPI 520 Part I §6.3.2

Back pressure correction — Kb not applied on conventional PSV with 18% superimposed back pressure

PSV-3201: conventional spring-loaded valve, superimposed back pressure 4.8 bar, set pressure 26 bar = 18.5%. Kb should be applied at this ratio; calculation uses Kb = 1.0.

MajorIEC 61882 §7.5

21 HAZOP actions with no assigned owner — FEED-to-FEED+ transition

HAZOP register PROJ-HAZ-002 Rev 4: 21 actions show status “Open” with no assigned owner and no due date. Register was issued 6 months ago with no status sweep since.

MinorIEC 61511-1 §9.3

C&E matrix missing 4 initiating causes present in HAZOP register

Comparing HAZOP register PROJ-HAZ-002 to C&E matrix PROJ-CAE-001: deviations 7C, 12A, 19B, 23D present in HAZOP with safety-critical consequences have no corresponding C&E row.

InfoAPI 521 §5.15

Flare header pressure drop not confirmed against worst-case simultaneous relief

Flare network hydraulic calculation FLR-CALC-001 considers normal operations. Worst-case simultaneous relief scenario (fire case + utility failure) not evaluated. May not govern but should be confirmed.

Codes & standards

What we check against.

API 520 Part I

Sizing, selection, and installation of PSVs — sizing

API 520 Part II

Installation requirements for pressure-relieving systems

API 521

Pressure-relieving and depressuring systems

API 526

Flanged steel pressure-relief valves — standard orifices

IEC 61511-1

Functional safety — SIS for process sector

IEC 61882

HAZOP studies — application guide

IEC 61508

Functional safety of E/E/PE systems — basis of IEC 61511

API 14C

Analysis, design, installation of basic surface safety systems

ISA S84 / IEC 61511

Safety Instrumented Systems in the US process industry

ASME PTC 25

Pressure relief devices — performance test codes

What we do not replace.

SpecSense checks relief sizing inputs against code requirements, HAZOP actions against register completeness, and SIL targets against calculation presence. It does not run dynamic simulation (HYSYS/UNISIM), it does not perform independent SIL verification per IEC 61508, and it does not replace the HAZOP team. It gives the OE a traceable audit of whether the documentation reflects the safety engineering — before you submit it.

Ready to run process through SpecSense?

Drop a HAZOP register, relief sizing calc, or cause-and-effect matrix. 48-hour supervised pilot. Chartered-engineer sign-off.